Arndale Footbridge DOFF Cleaning
We were appointed to carry out the annual cleaning of the Arndale Footbridge

The Scope
Vertical Access were appointed to carry out the annual cleaning of a high-profile city centre pedestrian link bridge, located within Manchester’s busy retail district. The structure, which connects key parts of the Arndale Centre, required careful planning and execution due to its location above live pedestrian areas and its proximity to the Metrolink tram network.
Challenge
The project involved delivering specialist cleaning works in a busy, high-profile city centre location, directly adjacent to the Manchester Metrolink tram infrastructure.
Key challenges included:
- Maintaining safety in a live public environment.
- Coordinating with multiple stakeholders, including Arndale Centre management, Metrolink operations & major retail outlets.
- Avoiding disruption to tram services and city centre retail.
- Cleaning painted building surfaces, including glazing & steelwork, effectively without causing any damage.
Our Response
Detailed risk assessments and method statements were agreed in advance with both the Arndale Centre and Metrolink. Exclusion zones and controlled work periods were established to safeguard the public, tram services, our team and critical transport infrastructure throughout the works.
A combination of Mobile Elevated Platform (MEWP) and rope access techniques was selected to reach every section of the structure while minimising disruption. This allowed our team to carry out a consistent, high-quality clean across the structure.
To protect the painted surfaces, we utilised a DOFF steam cleaning system rather than conventional power washing. The low-pressure, high-temperature steam gently lifts dirt and contaminants while preserving the integrity of the paint finish, something that traditional pressure washing could not achieve.
Operating in such a busy location required flexibility, so our teams scheduled works around peak city centre hours and adapted their methods to suit changing conditions on site. By working collaboratively with stakeholders and adjusting our approach as needed, we were able to complete the works efficiently without disruption to retail operations or tram services.
Outcome
- The works were completed safely, on time, and within agreed parameters, with zero incidents reported.
- The building surfaces were restored to a clean, well-presented finish while ensuring no damage to existing paintwork.
- Tram operations and retail activities remained uninterrupted, thanks to careful planning and flexible scheduling.
- Positive feedback was received from both the Arndale Centre management and Metrolink, reinforcing Vertical Access’s reputation for delivering complex city centre projects with professionalism and care.