With the use of rope access and cradle access systems Vertical Access has dramatically
reduced the overall project costs associated with bridge inspection, repair and maintenance.
All works can be undertaken ‘Ground Up’ thereby eliminating the requirement for costly
possessions and isolations of the bridge.
Project duration is reduced as scaffolding is not required thereby reducing site
establishment and clearance times. Furthermore all preparatory works for the inspection
can be undertaken by industrial rope access, further increasing site efficiency.
Specialised Bridge Services
Bridge Inspection & Surveys
Spandrel Tie Bars & Pattress Plate Installation
Replacement of Defective Brickwork for Patch Repairs in Arch rings
Grouting of Brickwork and Stonework fractures
Arch Rings - Cross Stitching & Grouting
Stitching of Longitudinal cracks between voussoirs and arch barrel